Build a structured test plan with entry and exit criteria supplied, each test level's limits stated, and the out-of-scope section nobody writes.
Name what is being tested
A plan that does not say what it is for cannot be reviewed or reused.
Without an out-of-scope section everybody assumes a different boundary, and the argument about what was supposed to have been tested happens after the release.
What this product has
Name what is being tested to generate a plan.
Good for: The logic with branches in it: validation, calculation, state transitions, parsing.
Cannot tell you: Says nothing about whether the pieces are wired together, which is where most defects that reach users live.
Good for: The joins: the request reaching the handler, the handler reaching storage, the response coming back out.
Cannot tell you: Usually runs against a test database and test doubles, so it does not cover production configuration or scale.
Good for: One or two whole journeys through the real interface, proving the system works as a system.
Cannot tell you: Slow and the first to become flaky. A suite of a hundred of these stops being run, which is worse than having ten.
Good for: Judgement: wording, layout, whether the thing is usable, and anything a person has to look at.
Cannot tell you: Not repeatable, so it cannot be relied on to catch a regression. Anything repeatable belongs in a test.
Good for: Keyboard operation, focus handling, semantics, and a pass with a screen reader.
Cannot tell you: Automated checks find roughly a third of the problems. The rest need a person, including every question of whether something makes sense.
Good for: Behaviour at realistic data volume and under concurrent use.
Cannot tell you: Results are only as good as the test data. Synthetic data of uniform shape hides the queries that production data makes slow.
A plan does not prove the absence of defects. It records what was looked at, which is a different and achievable claim — and it does not replace a specialist review where one is needed. Nothing in it has been executed.
QA Test Plan Generator runs entirely on your device — the plan is assembled in your browser and nothing you type is sent.
You’re on the Free plan. Compare plans
The most useful section of a test plan is the one most often missing: out of scope. Without it everybody assumes a different boundary, and the argument about what was supposed to have been tested happens after the release instead of before it. An empty out-of-scope section is flagged here rather than quietly accepted.
Each test level comes with what it cannot tell you. A plan listing "unit, integration, end-to-end" has said nothing; the useful part is that unit tests say nothing about whether the pieces are wired together, that integration tests run against doubles rather than production configuration, and that a suite of a hundred end-to-end tests stops being run — which is worse than having ten.
Entry and exit criteria are supplied rather than left blank, because they are the same every time and a blank field gets filled with something vague. The exit criteria include a recorded reason for every case not run, which is the thing that makes a pass repeatable rather than a one-off.
Because it is the section that prevents the argument after the release. Without it, the developer, the tester and the person who asked for the work each assume a different boundary — and all three are surprised at a different moment. It costs two minutes to write and saves the conversation entirely.
Because they are substantially the same for every plan, and a blank field invites something vague. The exit criteria here include a recorded reason for any case that was not run, which is what makes the pass auditable and repeatable rather than a single afternoon nobody can reconstruct.
Because the limitation is the useful part. Everyone knows what a unit test is; fewer plans acknowledge that unit tests say nothing about whether the pieces are wired together, which is where most defects that reach users actually live.
No, and the generated plan says so in its own last section. It records what was looked at, which is a different and achievable claim. It does not prove the absence of defects, and it does not replace a specialist review where one is needed.
Because plans without names are not carried out. An area assigned to "the team" is assigned to nobody, and it is the area that gets skipped when the week runs short.
If a tool here saved you some time, you can put something towards the hosting.Buy me a coffee, on Ko-fi, opens in a new tab